Daytime closures of Cockington Road
To facilitate resurfacing works, Cockington Road is to be closed between 3rd and 21st August (08:00-17:00 each weekday and until 19:00 on the 19th and 20th) There are no works on the weekends of 8th, 9th and 15th, 16th August.
Pink 28 towards Bilborough will be normal route along Bracebridge Drive to Burnside Green, where buses will terminate at the Burnside Green named stop.
Pink 28 towards City will depart the Burnside Green named stop and follow normal route along Bracebridge Drive.
Orange 35 towards Strelley and Bulwell will be normal route to Balloon Wood, buses will then turn right onto Trowell Road, left Glaisdale Drive, left Burnside Road and right onto Bracebridge Drive and normal route.
Orange 35 towards City will be normal route along Bracebridge Drive to Burnside Green, buses will then turn left onto Burnside Road, right Glaisdale Drive, right Trowell Road to Balloon Wood and left onto Wollaton Vale and normal route.
Stops on Cockington, Birchover, Stotfield and Bilborough Road cannot be served during these works.
Closure of Nuthall Road
Resurfacing works are taking place on Nuthall Road each weekday between 18th August and 1st September. On each weekday (no weekend works) from 07:30 until 16:00 Turquoise line will divert as follows:
Turquoise 78/79 towards Strelley or Bulwell: Buses will be normal route to the junction of Aspley Lane. Buses will then turn left onto Aspley Lane, right onto Western Boulevard, and left onto Nuthall Road and normal route.
Turquoise 78/79 to City: Buses will be normal route.
Roadworks - Wollaton Vale
The Wollaton Rise named stop on Wollaton Vale, used by Orange 35/B towards Strelley and Bulwell is closed because of roadworks.